28Findings
6 red flags
12 yellow flags
10 green findings
APN 011-241-009-000 Lot 3,920 sq ft Taxes now $1,055/yr (will reset on sale) Water/Sewer City / Public Inspected 07/03/2026
Property facts pulled from the disclosure packet and public-record advisory inside it

Your questions

The $55,000 foundation quote

The packet contains two written bids, both from Xalos Foundation Support Inc. Their Detail Plan shows floor readings from -0.2 to -4.2 inches, the load-bearing area marked "sagging," and 6 vertical cracks in the perimeter foundation.

Option 1, $14,559: support jacks, carbon fiber, and crack injections. Stabilizes, but its own warranty excludes failure caused by foundation movement or settlement.

Option 2, $55,010: everything above plus 13 steel piers driven to solid soil, with engineering and permits. This is the only option whose warranty covers future settlement in the underpinned area.

The home inspector tagged the foundation cracks as a safety hazard and recommended a structural engineer evaluate and provide a report on course of action and remedy (typical cost $575 to $2,300).

Foundation Reports 1 & 2Inspection 4.1.1, p. 26
The dry rot and the roof

Roof: the inspector wrote "major roof damage was observed," found ponding and missing flashings, and saw leak staining in the attic. The sellers also disclosed a roof leak repaired in 2024, and the TDS lists shingle age at 10 to 15 years. Budget frame: $1,000 to $5,000 for repairs; roughly $10,800 to $22,700 if the roofer calls for a full re-roof, plus the garage roof, which the inspector called unfinished/improper.

Dry rot: noted at the house siding and the garage eaves. There is no pest/termite report in the packet. A WDO inspection ($105 to $345) is the document that prices dry rot repairs. Siding, trim, and flashing work pending that report: roughly $2,500 to $9,000.

Inspection pp. 9, 16-23SPQ 8A/10ATDS II.A
The shared garage

The sellers disclose the garage and its roof are shared on one side with the neighbor on Spring Street, plus shared fences. No written maintenance agreement appears in the packet, and no preliminary title report is in the packet, so no document on hand shows how costs or repairs are split.

Escrow's preliminary title report will show any recorded agreement or easement. The listing side can be asked in writing whether one exists. A real estate attorney can review whatever surfaces before contingencies expire.

TDS C2SPQ 15D + amendment
Bringing in a contractor, and who to call

The inspector's recommendation is a structural engineer first (items 4.1.1, 4.3.1); other trade scopes depend on the engineer's findings. After that, either one general contractor walkthrough or targeted bids from a roofer, electrician, and plumber. The full evaluation menu with price ranges is in the cost guide below (roughly $1,800 to $5,700 for all of them).

Inspection 4.1.1Cost guide below

Red flags

Documented in the packet.

Foundation settlement, measured and bid.

Details in your first question above. Inspector: safety hazard, structural engineer recommended. Neither Xalos proposal prints a CSLB license number; verify at cslb.ca.gov (not verified as of this review).

Foundation Reports 1-2Inspection 4.1.1/4.3.1/4.3.2

No heating system.

"This home did not have any heating equipment during time of inspection." No furnace, heat pump, or ductwork; the TDS lists none either. Adding heat runs from about $1,600 (single mini-split) to $17,250 (whole-home system). Per the NHD, NOx-emitting gas furnaces and water heaters cannot be sold or installed in the Bay Area starting January 1, 2027; the NHD advises verifying electrical capacity for electric replacements (100A panel, next item).

Inspection p. 29TDS II.ANHD p. 37

Ten electrical safety items on a 100A panel.

Incorrectly wired breaker (inspector recommends the electrician check the entire panel), double-tapped breaker, reverse polarity, open ground, missing GFCI protection in required locations, improper attic wiring, missing panel labels, missing cover plates, missing service drop loop, plus repeated wiring concerns at the detached garage. Corrections estimated at $1,600 to $4,600 if the panel is salvageable; a full panel replacement would add roughly $2,100 to $6,900.

Inspection Sec. 7 + 8.6.1, pp. 37-47

Roof damage documented.

"Major roof damage was observed." Ponding, flashings absent, gutter system damaged or missing in sections, leak staining in the attic, sagging ceiling drywall from moisture above, and a seller-disclosed 2024 roof leak repair. Garage roofing called unfinished/improper. Roofer evaluation $130 to $415; repair vs re-roof decision follows.

Inspection pp. 16-23, 46, 54SPQ 10A

FEMA flood zone AE plus dam inundation.

The parcel is inside a Special Flood Hazard Area (Zone AE) and a mapped dam-inundation area. Lenders generally require flood insurance in Zone AE.

NHD p. 12

Mold: the sellers answered Yes, with no explanation in the packet.

SPQ question 10B (mold, mildew, fungus, or spores, past or present) is marked Yes. The amendment addendum explains several other answers but not this one. Separately, the inspector saw possible mold discoloration in the attic and recommended lab analysis ($315 to $920). Request the sellers' specifics in writing; remediation, if a lab confirms anything, runs $525 to $6,900.

SPQ 10BInspection 8.3.2, p. 45

Yellow flags

No smoke or CO detectors were present at inspection.

The packet's Statement of Compliance provides that operable smoke alarms will be in place by close of escrow; the copy in this packet version is unsigned and undated. Carbon monoxide devices are not certified anywhere in the packet. Verify both at walkthrough.

Inspection 7.6.1/7.7.1WHSD

Crawlspace moisture, no vapor barrier, negative grading.

Water intrusion signs under the floor (safety item), dirt crawlspace with debris, grading sloping toward the house, downspouts missing or draining at the foundation. Water management package: roughly $2,500 to $12,300.

Inspection 2.6.1, 3.2.x, 4.3.2, 8.2.1

2024 remodel, permit status unknown.

Sellers disclose new flooring, countertops, paint, two bathroom remodels, and plumbing repairs under the house in 2024. No permit information appears in the packet (not verified as of this review); check with the City of Calistoga building department.

SPQ 7A + amendment

Also disclosed or noted.

  • Shared garage, roof, and fences with the Spring Street neighbor (your question above)
  • Dry rot at siding and garage eaves, no pest report yet (your question above)
  • Multiple cracked windows plus failed seals, $105 to $805 per window
  • R-9 attic insulation, insufficient ventilation, bath fan venting into attic, $2,200 to $6,100
  • Plumbing corrections and untested fixtures (gas off, house vacant), $850 to $2,700
  • "Strong" shaking scenario (M6.7 West Napa) with moderate county liquefaction, for the structural engineer
  • Occasional rodent trapping over the years
  • Street and weekend hotel noise, per sellers
  • Prior tenants, eviction dismissed, vacant now
TDSSPQ + amendmentsInspectionNHD pp. 21-22

Green findings

  • No HOA or CC&Rs (SPQ 14)
  • No lawsuits, liens, or notices of default disclosed (SPQ 15C)
  • No deaths in 3 years, no insurance claims in 5 years, per sellers (SPQ 6A/6H)
  • City water and public sewer; no well, no septic (TDS)
  • Tankless water heater, located outside (Inspection)
  • Fire: not in High/Very High severity zone; mapped Moderate, LRA (NHD pp. 15-20)
  • Not in an Alquist-Priolo fault zone (NHD p. 21)
  • No Mello-Roos or 1915 bonds; current tax $1,055.04 on $91,377 assessed; per the NHD estimate, taxes reset at about 1.082% of purchase price plus $66.10 direct, confirm with the county or a tax professional (NHD pp. 40-47)
  • Environmental screens: 6 former leaking-tank sites within ¼ mile, all closed; no Superfund within a mile (NHD pp. 48-53)
  • The TDS and SPQ amendments and the listing agent's room-by-room AVID are both in the packet, and the AVID matches the inspection on un-level floors, cracks, and exposed closet wiring

Cost guide

Two numbers are real bids from the packet. Everything else is a budgeting estimate from April 2026 regional contractor pricing adjusted for Napa County; estimates are planning frames, not quotes, and actual bids will vary.

Step 1 · Scope the house: $1,800 to $5,700 total

EvaluationEstimateWhy
Structural engineer, report$575 to $2,300Inspector's recommendation (4.1.1)
Electrician, whole-panel evaluation$300 to $60010 safety items; also determines panel capacity for electric heat
Roofer, house + garage$130 to $415Repair vs re-roof decision
Pest / WDO inspection$105 to $345Prices the dry rot; not in packet
Mold lab analysis$315 to $920Attic discoloration + the SPQ 10B Yes
Plumber$200 to $400Drain connection, shower valve, gas shutoff
Sewer lateral camera$210 to $690Older home; not in packet

Step 2 · The repair budget those evaluations refine

ItemRangeBasis
Foundation$14,559 or $55,010Actual bids; warranties differ meaningfully
Add heating$1,600 to $17,250Mini-split low end; whole-home top end; gas options end 1/1/2027 per NHD p. 37
Electrical corrections$1,600 to $4,600Panel replacement, if needed, adds $2,100 to $6,900
Roof repairs$1,000 to $5,000Full re-roof, if called for: $10,800 to $22,700 + garage
Water management (gutters, grading, vapor barrier, drainage)$2,500 to $12,300Protects the foundation work
Siding, dry rot, flashing$2,500 to $9,000Pending pest report
Detectors + GFCI$750 to $2,200Smoke alarms are the sellers' close-of-escrow item
Attic insulation + ventilation$2,200 to $6,100R-9 today per inspection
Plumbing corrections$850 to $2,700Section 6 items + gas shutoff
Windows$105 to $805 eachGlass swap vs full replacement
Mold remediation, if confirmed$525 to $6,900Spot to extensive
Concrete, trees, interior touch-ups$1,700 to $7,100Combined smaller items
Planning ranges: stabilize-and-make-safe (foundation option 1, electrical corrections, detectors, one mini-split, roof repair, water management, plumbing) totals roughly $25,000 to $45,000. The comprehensive path (piers, panel-level electrical, whole-home heating, full roof scope, full water management, siding) totals roughly $80,000 to $110,000; if every line lands at the top of its range, higher. These are budgeting frames, not quotes.

Not in the packet

Next steps

MS
Matt Smith
Real estate agent · CalDRE #02184215 · Luxe Places International Realty, DRE #01522223
Text Matt · (707) 893-7374

Sources and verification

Reviewed: the complete packet as published July 18, 2026, all 20 documents plus cover, 261 pages, including the Home Inspection (Lifestyle Home Inspections LLC, 07/03/2026, 65 pp), JCP-LGS NHD Report No. 3612655 (06/30/2026, 68 pp), TDS and SPQ (07/03/2026) with their amendments (undated in the packet copies), the AVID (Aspira Realty), and both Xalos Foundation Support proposals (07/08 and 07/09/2026). List price and MLS number per the active listing.

Verification: statements in this review were checked against the cited source documents, including page-image review of the scanned TDS and SPQ checkboxes, on July 19, 2026. If anything here differs from a source document, the document controls. Cost figures other than the two foundation bids are estimates from regional 2026 contractor pricing adjusted for Napa County. Permit status, contractor license status, and square footage have not been independently verified. A note for precision: the Xalos paperwork spells the name "Tomas" and the address "1406 West Myrtle Street," which reads as clerical error but is worth confirming.

This review is an informational summary of the sellers' disclosure packet, prepared by Matthew Smith Realty for the client named above. It is not an inspection, engineering opinion, legal, insurance, or tax advice, and it is not a substitute for reading the full documents; it does not modify any disclosure or contract right. Where the packet is silent, this review states so. Buyers should verify all material facts through their own inspections and professionals during their contingency period.